Rayzon Solar Ltd
Surat TOPCon module maker with 11.31 GW ALMM-listed capacity, FY26 revenue ₹6,065 Cr and PAT ₹468 Cr; SEBI-cleared ₹1,500 Cr fresh-issue IPO pending, 5.1 GW cell plant due December 2026. Dealer sell quote ₹250 = ₹7,650 Cr market cap, 16.3x FY26 earnings, 7.4x book.
Market cap
₹7,650 Cr
30.60 Cr shares
P/E ratio
16.35
Sector average 40
Book value
₹33.64
P/B 7.43
1-year return
+0.00%
52w ₹250 – ₹250
Currently 0% of the way through its 52-week range.
Indicative price history
1Y change
+6.84% ₹234 → ₹250
52-week band in this window: ₹234.00 – ₹250.00. Weekly indicative marks, not exchange-traded prices.
Key highlights
- Dealer sell quote ₹250 (15 Nov 2026) = ₹7,650 Cr market cap; 16.3x FY26 EPS ₹15.36, 7.4x BVPS ₹33.65, EV/EBITDA 10.7x, 1.26x sales; +6.8% over the ₹234 round of March 2025.
- FY26 consolidated: revenue ₹6,064.74 Cr (+115%), EBITDA ₹778.15 Cr (12.8%), PAT ₹467.79 Cr (+42.5%); FY25 ₹2,818.81 Cr / ₹489.46 Cr / ₹328.29 Cr; FY24 ₹1,272.85 Cr / ₹101.41 Cr / ₹60.94 Cr.
- Balance sheet 31 Mar 2026: net worth ₹1,029.46 Cr, borrowings ₹767.41 Cr, cash ₹114.03 Cr, inventories ₹1,023 Cr, receivables ₹529 Cr, total assets ₹3,184 Cr; D/E 0.75x, net debt/EBITDA 0.84x, ROE 59.2%; no dividend.
- Capacity 0.04 GW (2017) → 11.31 GW ALMM-approved (May 2026); 7.3 GW+ modules supplied; order book 3.60 GW at 31 May 2025 (DRHP).
- 5.1 GW TOPCon cell plant (Rayzon Energy, Kathvada) to start December 2026, funded by a ₹1,350 Cr Union Bank term loan; 19,800 MTPA aluminium plant running; 5.1 GW wafer plant targeted 2028.
- IPO: ₹1,500 Cr fresh issue, no OFS; DRHP June 2025, SEBI final observations 13 Oct 2025; RHP pending as of Nov 2026.
- 30,60,06,582 shares of ₹2 after the 29 Apr 2026 ESOP allotment; promoters ~98.1%; ESOP Plan 2025 up to 1 crore options.
- CRISIL A-/Positive (long-term) and A2+ (short-term); clean statutory and secretarial audit reports (K A R M A & Co LLP, Suresh I Surana & Associates).
- Watch: RHP and price band, Dec 2026 cell-plant commissioning, FY27 margins (EBITDA margin fell 453 bps in FY26), working-capital intensity and debt after the cell-plant drawdown.
About Rayzon Solar
Rayzon Solar Limited is a Surat, Gujarat solar photovoltaic module manufacturer promoted by the Nakrani and Kothiya families. The business began in 2017 with a 40 MW line and was housed in the present company, incorporated on 20 June 2022 (CIN U29309GJ2022PLC133026) and converted to a public limited company in 2025 ahead of its IPO. Module capacity scaled from 0.04 GW (2017) to 1.1 GW (2022), 3 GW (2024), 6 GW (2025) and 8–10 GW in 2026; the MNRE ALMM list of May 2026 approves 11.31 GW of Rayzon capacity at Kim and Sava/Kosamba. It has supplied more than 7.3 GW of modules cumulatively — N-type TOPCon, bifacial, monofacial and all-black modules for utility-scale developers, C&I, rooftop and export customers — and reported an order book of 3.60 GW as of 31 May 2025 in its DRHP.
Backward integration is the strategic thrust. Wholly owned Rayzon Energy Private Limited is building a TOPCon solar-cell plant at Kathvada, Mangrol (Surat district), sized at 3.5 GW in the June 2025 DRHP (project cost about ₹1,651 Cr, of which ₹1,265 Cr was to come from the IPO and ₹300 Cr from an Axis Bank term loan) and since enlarged to 5.1 GW; press reports of 3 November 2026 say operations start in December 2026 with first deliveries in the March 2027 quarter, now funded largely by debt including a ₹1,350 Cr Union Bank of India term loan, and that a 5.1 GW ingot-and-wafer plant is targeted for 2028. A 19,800 MTPA aluminium-frame extrusion plant (Rayzon Industries, 66.67%) is operating, and Rayzon BESS, Rayzon Project and Better Power Projects (100% each) cover storage, generation and project solutions. The company runs an NABL-accredited R&D centre at Kim with research tie-ups with UNSW Australia and IIT Bombay and holds an EcoVadis Silver rating.
Financials (audited consolidated, FY2025-26 annual report as quoted in the Shree Finserv deal note): revenue from operations rose from ₹1,272.85 Cr in FY24 to ₹2,818.81 Cr in FY25 and ₹6,064.74 Cr in FY26 (+115%). EBITDA was ₹101.41 Cr, ₹489.46 Cr and ₹778.15 Cr (margins 8.0%, 17.4% and 12.8%); PAT ₹60.94 Cr, ₹328.29 Cr and ₹467.79 Cr (basic EPS ₹10.95 and ₹15.36 in FY25 and FY26). Net worth stood at ₹1,029.46 Cr on 31 March 2026 (₹553.43 Cr a year earlier), borrowings at ₹767.41 Cr (₹287.43 Cr), cash and bank at ₹114.03 Cr (₹148.50 Cr) and total assets at ₹3,183.90 Cr (₹1,407.74 Cr). Inventories grew 2.8x to ₹1,023.22 Cr and receivables 2.7x to ₹529.39 Cr. ROE was 59.2% (102.5%), debt/equity 0.75x (0.52x) and net debt/EBITDA 0.84x (0.25x). No dividend has been paid. Standalone FY26 total income was ₹6,075.90 Cr and PAT ₹479.57 Cr. The statutory auditors (K A R M A & Co LLP and Suresh I Surana & Associates) and the secretarial auditor gave clean reports.
Capital and ownership: 30,60,06,582 equity shares of ₹2 after the 29 April 2026 allotment of 1,17,490 ESOP shares (paid-up capital ₹61.20 Cr). The only outside round so far was a private placement of 58,89,092 shares at ₹234 (₹137.8 Cr, post-money about ₹7,158 Cr) allotted on 25 March 2025 to about 90 individuals including Harshadkumar Patel (₹26.8 Cr), Sachin Tendulkar (₹5 Cr) and Divyang Patel (₹5 Cr). Promoters — Chirag D. Nakrani (MD), Hardik A. Kothiya (Chairman and Joint MD), Devchandbhai K. Nakrani (whole-time director), their families and the AMK and DKN family trusts — hold about 98.1%. ESOP Plan 2025 provides for up to 1 crore options. The DRHP filed on 25–26 June 2025 proposes a fresh issue of up to ₹1,500 Cr with no offer for sale (BRLMs SBI Capital Markets, Ambit and IIFL Capital; listing on BSE and NSE); SEBI issued its final observations on 13 October 2025, and the RHP, price band and dates were still pending in November 2026.
Valuation at the ₹250 dealer sell quote (Shree Finserv, 15 November 2026): market capitalisation ₹7,650 Cr on 30.60 Cr shares, 16.3x FY26 basic EPS of ₹15.36, 7.4x book value of ₹33.65 per share, enterprise value ₹8,304 Cr (adding ₹767 Cr debt, less ₹114 Cr cash) or 10.7x FY26 EBITDA, and 1.26x FY26 sales — a 6.8% premium to the ₹234 pre-IPO round of March 2025 even though profit has risen 43% since. That is a discount to listed module peers (Waaree Energies, Premier Energies) on earnings, but the business is now margin-compressing (EBITDA margin down 453 bps in FY26), working-capital-hungry (inventory plus receivables ₹1,553 Cr against ₹1,029 Cr of equity) and about to double its debt again for the cell plant. Catalysts: the RHP and price band, December 2026 cell-plant commissioning, FY27 half-year results showing whether margins stabilise, and DCR/ALMM List-II demand for integrated makers. Risks: module-price cycles, execution of a ₹1,650 Cr-plus capex, IPO timing (SEBI observations have a one-year validity window) and the six-month post-listing lock-in on pre-IPO shares.
Where the revenue comes from
- Solar PV modules — domestic (utility, C&I, rooftop)78%
TOPCon/bifacial modules to IPPs, EPCs, C&I and PM Surya Ghar channels; order book 3.60 GW at 31 May 2025 (DRHP). Share estimated
- Solar PV modules — exports14%
Exports including the US market via Rayzon Solar USA; share estimated
- Aluminium extrusion (Rayzon Industries, 66.67%)5%
19,800 MTPA frame-extrusion plant, largely captive; third-party share estimated
- Cells, BESS and projects3%
5.1 GW TOPCon cell plant starts Dec 2026 (pre-revenue in FY26); Rayzon BESS, Rayzon Project and Better Power Projects are small; share estimated
Products & services
N-type TOPCon modules
High-efficiency bifacial and monofacial TOPCon modules (G12R and M10 formats) for utility-scale and C&I projects; ALMM-listed.
Bifacial, monofacial and all-black modules
Mono-PERC/TOPCon variants for rooftop, PM Surya Ghar residential and export markets, including an all-black aesthetic series.
TOPCon solar cells (from Dec 2026)
5.1 GW cell plant under Rayzon Energy at Kathvada, Mangrol, for captive use and ALMM List-II/DCR projects.
Aluminium frames
19,800 MTPA extrusion plant (Rayzon Industries, 66.67%) supplying module frames.
BESS and solar project solutions
Rayzon BESS (storage), Rayzon Project and Better Power Projects (generation and EPC solutions); early stage.
What works
- • Scale and growth: revenue doubled two years running to ₹6,064.74 Cr in FY26 with PAT of ₹467.79 Cr (EPS ₹15.36); 11.31 GW ALMM-approved module capacity and 7.3 GW+ cumulative supplies make it one of India's four or five largest module makers.
- • High returns on capital: ROE 59.2% in FY26 (102.5% in FY25) and net debt/EBITDA of only 0.84x; net worth has grown from about ₹87 Cr (FY24, derived) to ₹1,029.46 Cr almost entirely from retained profit, with just ₹137.8 Cr of outside equity raised.
- • Backward integration under way: a 5.1 GW TOPCon cell plant (Rayzon Energy, 100%) is slated to start in December 2026, with funding (₹1,350 Cr Union Bank term loan) already tied up; ALMM List-II/DCR norms from June 2026 favour cell-integrated manufacturers, and an aluminium-frame plant is already running.
- • IPO pipeline is cleared: the ₹1,500 Cr fresh-issue DRHP (no promoter selling) received SEBI's final observations on 13 October 2025; proceeds de-lever the cell project and would give pre-IPO holders a listed exit.
- • Valuation at ₹250 is undemanding against listed peers — 16.3x trailing earnings, 10.7x EV/EBITDA and 1.26x sales — and only 6.8% above the ₹234 round of March 2025 despite 43% PAT growth since.
- • Clean governance signals in the filing: unqualified statutory and secretarial audit reports, two joint audit firms, five independent directors (appointed January and June 2025), a NABL R&D centre, CRISIL A-/Positive and A2+ ratings and an EcoVadis Silver rating.
- • Marquee pre-IPO investors (Sachin Tendulkar, Harshadkumar Patel and about 90 individuals) came in at ₹234 in March 2025, setting a reference price that an IPO is unlikely to undercut without reputational cost.
What to watch
- • Margin compression: EBITDA margin fell from 17.4% in FY25 to 12.8% in FY26 and PAT margin from 11.7% to 7.7%; module realisations are cyclical and Waaree, Premier, Vikram, Adani and Goldi are all adding capacity, so FY27 earnings could fall even as volumes grow.
- • Working capital and leverage are rising fast: inventories up 2.8x to ₹1,023 Cr, receivables up 2.7x to ₹529 Cr, borrowings up 2.7x to ₹767 Cr and cash down to ₹114 Cr; finance cost nearly tripled to ₹57 Cr. The ₹1,350 Cr cell-plant loan will lift debt/equity well above the FY26 0.75x before the IPO money arrives.
- • Cell-plant execution risk: a greenfield 5.1 GW TOPCon cell line (project cost ₹1,650 Cr-plus at the 3.5 GW stage) must commission in December 2026 and ramp yields in FY27; delays or low yields would strand capital and leave the company dependent on imported cells.
- • IPO timing and price are not assured: SEBI's 13 October 2025 observations carry a one-year validity window and the RHP had not been filed by mid-November 2026; the company has already shifted cell-plant funding to debt, suggesting the listing has slipped. A fresh-issue price below ₹250, or a further delay, caps the near-term return.
- • Concentrated ownership (~98.1% promoter) with no institutional investor on the register: minority investors have little influence, related-party dealings (five subsidiaries including a 66.67%-held aluminium venture) are not detailed in the deal note, and the FY26 annual report itself was not retrievable to verify remuneration or related-party spend.
- • Policy dependence: demand rests on ALMM, DCR and anti-dumping protection and on PM Surya Ghar and PM-KUSUM budgets; any dilution of these, or a surge in cheap Chinese modules, would hit both pricing and the case for domestic cells.
- • Liquidity and lock-in: unlisted shares trade off-market in small lots; pre-IPO holdings of non-promoters are locked in for six months from IPO allotment, and quotes can move sharply on IPO news. Minimum lot 100 shares (₹25,000) plus 0.015% stamp duty.
- • Data gaps: the profile relies on a dealer deal note quoting the FY26 report; FY24 cost splits and balance sheet, cash flows, other income and investments are estimates or zero, and the ISIN was not found — verify in the RHP before transacting.
Compare with peers
| Company | Price | Market cap | P/E | P/B | Rev CAGR |
|---|---|---|---|---|---|
| Rayzon SolarThis page | ₹250.00 | ₹7,650 Cr | 16.35 | 7.43 | +118.28% |
| Goldi Solar | ₹320.25 | ₹11,293 Cr | 0.93 | 0.18 | +0.00% |
| Jupiter Solar | ₹300.00 | ₹77.4 Cr | 27.65 | 2.81 | +18.32% |
| Navitas Solar | ₹1,460.00 | ₹1,249 Cr | 47.67 | 15.90 | +133.08% |
| Insolare | ₹138.60 | ₹415.8 Cr | 21.90 | 3.96 | +49.07% |
Latest reported year: FY26 ending 31 Mar 2026.